Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to design an isolated footing having load and moment
acting on the column also draw pressure diagram at the base

Answer Posted / sajin

please send me result my e_mail id is p.sajin89@gmail.com

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards

2077


Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.

2665


1m square 20mm plastering how much of water need curing work

1947


what is difference between GTS bench mark and temporary bench mark

5149


in one SQM plaster how much Cement and sand consumed in ratio 1:4

2283


can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???

2018


In earth work 1300 cum soil how to calculate how many liters require in water

2547


What are the composition of a landfill?

1309


What was asked in isro civil interview

1175


Mention different types of roof systems?

1238


In csae of hume pipes NP stands for Non Pressure bur what does it really mean?

2367


cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building

2490


may i know the detailed description of cutting length

2088


What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)

2166


What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?

2187