Answer Posted / raj.m
I am a civil engineer please answer the question
Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
can stub column take the load as main column
How is the leaning tower of pisa supported?
what will be density of a cement bag if its weight and volume are 50kg and 1.25 cft respectively???????
what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u
What is construction mitigation management?
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
Why reinforcement done in shorter span in two way slabs
what is Brick crushing strength(PSI)?
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
what is the price of a cubic meter of concrete on international market?
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument
How to arrive d*d/162 , for finding the kg per meter , wt of steel