How can we calculate quantity of slab, beam @ column ?
Beam should be calculated by deducting slab thickness or
slab should be calculate in to in ?
Answer Posted / bharath m
Dear Mr.Jayesh,
Please Note:
1.Slab Concrete Quantity
Area of Slab including beam & Column covered area x Overall Depth of Slab.
2.Beam Concrete Quantity
Clear Span of BeamxBeam Widthx(Overall Depth of Beam-Overall depth of Slab)
3.Column Concrete Quantity
Lenght of ColumnxWidth of Columnx(Floor to Floor Height of Column-Overall Depth of Slab)
If still any queries pl. raise through Allinterview/to the Undersigned.
Thanks
Bharath
8438238335/9980644165
bharath.dce2006@gmail.com
| Is This Answer Correct ? | 4 Yes | 6 No |
Post New Answer View All Answers
What is the Unit weight of coarse sand (F.M- 2.20) ?????
who to find building iron rod strenth
crank types
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
What are the ingredients of pre-stressed concrete?
What is the crank length in the slab?
give me the rate analysis for Bituminous Macadam and SDBC
how to take concrete quantity for precast segment for viaduct project?
Whats the meanig of ,'K' VALUE in the case of soil.....
residential buildings,mixing of concrete,structural,construction material,site handling.
what is the minimum cement content for M20 & M25 as per is code -456(2000).
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????