What is the difference between nominal mix and design mix?

Answer Posted / ramadass

nominal mix is a mixing ratio constant and also vary widely
strenght of concrete maximum size of aggregate ,design mix
is performance based the property like strenght durability
workability &cost of material is reduced

Is This Answer Correct ?    0 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the Types Of DPC and its Thickness used?

953


what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)

1283


What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?

1669


sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].

1683


how to find quantity of concrete in PCC M15

1682






how to prepare site mix design

1555


Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?

2390


What is a bearing capacity of soil?

811


List out some of the common problems that architect have to tackle it?

634


how meny typs of renging rod?

1792


What is high adherence steel bar? I have a general specification which refers to High Adherence steel bars, coils and meshes to BS EN 10080 and BS 4449 or BS 4483. Is this just general re-bar or is there something different about it? The spec originated in France.

4432


if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete

1618


whats is difference between anchorage length and development length

1374


What are the different types of civil engineering?

647


at which depth the construction of tunnel is economical from cost and engineering aspect.