Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How many kilo of binding wire required for one ton of reinforcemet steel binding?

Answer Posted / bharath m,9980644165

8 to 10 Kilograms per MT.of Steel Reinforcement & Also Based on Structural Design it will vary from mentioned data.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in

2522


What is the difference between 53 grade and 43 grade cement

1718


How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit

6493


One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?

2354


Define What is the distance between railway tracks?

1110


What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?

2266


i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available

1901


How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance

2950


will fix foundation bolts at site with out template is there any procedure?

2621


What are the advantages of cad?

1077


Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.

1738


I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item

1912


Explain what are the skills required to become an architect?

1143


how to calculate MR 9(derivation)

2922


detailed calculation of the amount of cement used?

2061