how can i calculate pcc and rcc cu.mtr rate? specify labor
and material cost should be diff
Answer Posted / r.sundarraj
urgent reguired
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
What are the uses of layer?
difference between trapezoidal and pedestal footing and how the load acts on that
Define the various stages of the project planning process in construction.
What is the best type of wood glue?
In which code the the maximum height of concrete casting has been explained
How to calculate canal slope curvature qty!
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
What is the difference between pvc,cpvc and upvc and where it is used as per their properties?????
How much does the leaning tower of pisa lean?
Are cruise ships built for the transatlantic run?