how to calculate steel quantity in plinth beam&footing
Answer Posted / ijaz ulhaq
d2/24*lenght=kg/ft
| Is This Answer Correct ? | 4 Yes | 8 No |
Post New Answer View All Answers
Technical Question of Civil Engineering
what is the procedure of wet seiving. n percentage of silt in different type of soil?
What is aggregate?
what is meant by csr in foundation? what is sbc?what is meant by contour line?
what is idealized curve for concrere and steel
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
What is the development length given in pile?
Define What is rigging?
Define What is the origin of name Railway Sleepers?
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
What do you mean by tolerance factor of concrete ?
what is moment-curvature relationship in semi rigid connections??
Difference between pre-tensioning and post-tensioning.
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help