which grade of concrete is the strongest?
M20,M25,M30,M35 or M40?
Answer Posted / arun pandiyan
M30 GRADE
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what are the code used for residental building?
what is civil all interview questions
how to identify the failure of building by expansive soils
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete
What is the density of most of construction materials?
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
explain five benefits of using standard terminology in the measurement process?
how to calculate the size of triangular ring in rcc column?
How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
What is the use of water table & Kreb stone for drain
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.