Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how much least
count of
levelling ?

Answer Posted / manikanta

0.05

Is This Answer Correct ?    0 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

five requirements of infill panels for walls?

3711


if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix

1894


Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.

2847


what is the sequence of the activities in the typical under ground water tank including civil & MEP works.

2414


what post do you prefer to work in this company and why do you think you can serve better in such position?

2799


1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.

2107


Difference between lime, distemper and plastic emulsion?

1717


how to do sudoko puzaals?

2255


cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com

2176


which are the Indian auther books for STONE COLUMN/GRANULAR PILES?

2378


whou haat goals do you have in your career

2140


A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.

2240


What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete

7172


will fix foundation bolts at site with out template is there any procedure?

2619


What is 1/8 on the architect ruler denotes?

1141