what is least count of vernier caliper
Answer Posted / syed
0.01mm
| Is This Answer Correct ? | 8 Yes | 8 No |
Post New Answer View All Answers
what will be the minimum bearing clearance that after it will not profitable for machines?
Crankcase oil mist detector
explain how do seamless pipes looks like and when they r used?
what is first law of Thermodynamics ? What is second law of Thermodynamics ?
Can anybody please tell me from where I can get sample placement papers so that ii can prepare accordingly.
how much stack emmission through your chimney & what is the state govt. norms.?
How do you detect earth by lam p?
send me vizagsteel papers (m.t.. please.)
Causes of emergency trip of diesel engine
Name the sheet metal hand tools?
I need some information on EOT CRANES AVAILABILITY calculation and criteria.
Which welding process uses non-consumable electrodes?
what is difference between dry and flooded type chiller?
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb
Why iso-octane is chosen as reference fuel for s.i. Engines and allotted 100 value for its octane number ?