qty of cement,sand and aggregate (1:3:6) required for RCC
Slab size 1000 x 500 x 100 mm
Answer Posted / rao
aggregate 0.05
sand 0.024
cement 16 kgs
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
please send me bhel questions on rupesh.017@rediffmail.com
What is the cemnent ratio
what is relation between SPT N value and driving piles after conducting a soil test?
how much quantity of cement,sand and water required for 1 sq feet flooring work .
What is the basic difference between OPC
What you understand by building codes?
What is the difference between tor steel and tmt steel?
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
how to shuttering is used in slab
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
Why are separation membranes used between concrete pavement slab and sub-base?
Why the statue of liberty is made of copper?
Wat is meant by Aecron brick?
in design case of structural member best suitrable percentage of steel limit is what