why we take 4 to 20 mA as out put of every instrument like
pressure transmittre ?why we cant take 0 to 20mA as output?
Answer Posted / dinesh regar
when a 0-20mA used therefore insturment is not working i am
not indetified.there insturment are faulty ya supply
problem not sure.
therefore we used the 4-20ma .when supply will coming &
insturment not working.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Can any body help to get Rsemulator 5000 free from internet if possible then give me any link or any help .
Specify eight technical requirements that you would consider important, when deciding upon a particular control valve?
1.can you use SCADA instead of DCS,DCS instead SCADA 2.Difference between DCS and PLC,can their role be reversed i.e. role interchange 3.Difference between RTU and PLC
while am calibrating Drager polytron 2IR flame gas detector occured non zero status.how can i get zero status?
flow transmeter accuracy 0.075% of full scale & find ucertainty is 0.025 % so what is maximum limit band of uncertainty
define feed forward control loop with example and drawing?
Pressure tx shows 1 mbar but we need 1000 mbar at this process condition .. how can we sort it out .
in sulfur process what is material of impulse line we use to connect with transmitter ? and does teflon affected by sulfur?
What inherent design and operating principles are included in a modern control system to use predictive maintenance practices to increase overall system reliability?
basic connection and principle of axial shift sensor n differential sensors in tubine describes n draw......
What is the Working principle of Dozing valve?
hi my name is rakesh patel i just complited my be in instrumentation & control now i am going to working as a validation engineer in a poject department so what is a scope in a future as a validation engginer ? what line is good for me can any bady give me complete solution please? your regard rakesh patel
How works weighfeeders in cement industry? what is the working principle?
What are continuances of connecting earthing and shield of branch cables (instrument to Junction box), at the same earthing pot provided on JB? Is it ok, or may produce some problem?
Can Any body tell me how to check Modbus Settings in ER300N L&T trivector meter?