Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the unit weight of steel(kg/cum)& unit weight of
concrete in(kg/cum)?

Answer Posted / sardar khan "samsor"

The unit weight
Steel :7850kg/cum
Plain Cement Concrete : 2400kg/cum
Reinforced Concrete : 2500kg/cum
but in plain and Reinforced concrete the weight is belong to unit weight of sand and gravel.

Is This Answer Correct ?    27 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently

2563


PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.

2585


why we create short columns under grade slab?

2329


the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm

2362


Differentiate first angle & third angle projection?

1140


What are the different softwares used for cad?

1310


Explain what are the phases inspections are done by local authority while construction?

1209


what is the productivity in aluminium shuttering per day

2074


Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft

1891


How to calculate cement and river sand material Qty for waterproofing base coat and finish coat

2416


How to compute minimum number of columns required for a site from area of site?

2089


what is modular brick and it size

1757


what do you mean by yeild stress of a material? What will happen when hit is given to cement?

2360


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

2145


How to do base isolation for RC framed structure using ETABS software?

4210