how much quantity of bending wire required for 1sqmts
Answer Posted / ajaybir
this is wrong question
| Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
Sir how to find cutting length for footing steel bars in the shape of "u"
Explain what is Critical Path Method (C.P.M)?
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?
What are the main reasons for conducting pull-out tests for soil nails?
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
why does the most of civil engg is not intersted to going for teaching field?
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
what is idealized curve for concrere and steel
What is binding spacing of the rebars at lapping zones.