Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.

Answer Posted / anand shinde

h=(D-d)

(D-d)/3x(a1+a2x(under root a1xa2)

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the sequence of the activities in the typical under ground water tank including civil & MEP works.

1962


Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.

1429


What is rate of concrete surface rendering work per sqm

1440


WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?

1858


4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils

2301






what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.

1902


What is the standard volume of pharma in cub ft

1297


strength vs shape factor

2135


100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags

2029


what is the ingredient value of 40mm and 20mm aggregates?

1557


How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?

1434


Who name us Engineer & Why?

2031


how much required strength of cement concrete bricks(size 230x115x75mm)

1583


What is Gsb tollens ?

1536


how many cement used in single story residential building per sqft

1295