Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answer Posted / anand shinde
h=(D-d)
(D-d)/3x(a1+a2x(under root a1xa2)
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
what is concrete canvas?
Explain the latest method to detect a crack in a building?
A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S
What is difference between code and standard and specification?
what do you mean by yeild stress of a material? What will happen when hit is given to cement?
What is 1/8 on the architect ruler denotes?
on what basis the partial factor of safety are decided? form the load combinations
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
how to calculate freeboard in under ground water tank and technical details
what are the five benefits of using standard terminology in the measurement process?
How many square meter can a worker/labor demolish a structure per day?
how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
Define What is the distance between railway tracks?
how much cost of single coat 20mm thick plastering per sqre meter