what is the abbreviation & meaning of UI charges
Answer Posted / nagarajan
Un scheduled Interchange charges. This charges is being
collected by Regional Load Despatch Centre based on frequency
which is called ABT(Availability Based Tariff)Regulated by
CERC (Central Electricity Regulatory Commission)
| Is This Answer Correct ? | 8 Yes | 3 No |
Post New Answer View All Answers
show the single line diagram of star delta starter with single phase preventer
how was your last weekend.
how do u gauge the size of the cable ?for eg. consider a 300 sqmm L.T Cable.How do u determine the size of the cable seeing it pratically?
I am a electrical engg. diploma holder,applied for junior engineer (electrical),Kolkata RRB. Have I to attend all electrical,mechanical&civil portion in written exam.???
State the other types of Air Conditioners?
If I have 3 essential main switch board and 3 incoming electricity ,but only 1 genset running is that possible.
What is Instantaneous Earth fault relay,how will work
On Which Pressure PRV is operated.
Why cables and busbar both needed in LT Panels?
Dear sirs, pls check this 4-20ma to RS485 module datasheet,pls guve me some suggestions. http://www.szsunyuan.com/sy/pro_more.asp?Productid=539 Thanks. E-mail:yunianjiang99@gmail.com
what is POTT and PUTT explain?
What is the method for testing the differential protection stabilty in generator? When the time of starting What will happen if differentail protection connection wrong means?
How to calculate Air conditioning capacity for a telecom BTS shelter?
Briefly describe your ideal job?
i m doing DEEE in part time,can i join regular cources in BE,,IF i join what the cources can i select like (civil,ece,IT) ,,kindly advice