Answer Posted / ghouse rabbani
As per IS
10262-1987 water
content required
for m20 for one
cum is 186 kgs
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
For what building Built-on balconies are preferable? What are the advantages?
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
use ofr concrete as per grade ?
What is the use of mirror command?
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
give me the mix proportion for design mix concrete M 7.5 grade 1:4:8
what are the challenges of being a team leader and a supervisor?
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?
Slump Values for works?
what is the 0 value in quantity surveying
What was asked in isro civil interview
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
What are the steps involved in the concreting process?
how many types of survey and what are levelling instrument?