Answer Posted / vtu

M5 1:5:10
M7.5 1:4:8
M10 1:3:6
M15 1:2:4
M20 1:1.5:3
M25 1:1:2

Is This Answer Correct ?    432 Yes 56 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?

661


what is the max. area can we apply the plate load test ?

1895


How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)

1704


I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????

1626


who to find building iron rod strenth

1545






dialation means

1812


what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon

2302


What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.

1641


How to calculate sand , cement quantity for 23mm thk brick work(10x10)

4702


What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m

1713


What is the absolute pressure scale?

640


What is absolute coordinates?

673


Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft

1339


what is flashing?

695


what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)

1249