Answer Posted / jahnavi dagar
the drainage system is made for taking out the dirty water
from somewhere .
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Which ratio use for cement selery???
All aptitude question of Bechtel
what is project?
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
What is an ortho mode?
1:4:8 pcc calculation 591 cu.ft
What is the difference between tor steel and tmt steel?
For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?
How to avoid fly ash seed ball formations in the concrete mixer while mixing of raw materials for fly ash block manufacturing?
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
What is thumb rule for deep trench excavation
how meny typs of renging rod?
States some of the tool bars used in cad?
Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.