Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

the building construction what type of equipments are used
in site and its purpose?

Answer Posted / karthik

Normaly we used following equipments at site,
1.Tower Crane - Its used only if the area and & hgt of
building is more.Its used to save the time & manpower.
2.Excavator/Shovel/Back Hoe Loader(JCB) - For earth Work
3.Mobile Crane/Telehandler/Skid Steel Loader(Bobcat) -
Materila loading unloading
4.Generators

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how i get all type of short type question answer about civil engg

1701


Explain the advantages and disadvantages of using plastic and timber fenders?

1196


What is an ortho mode?

1245


How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?

1558


For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?

1817


how to take the quantity of block work and plastering  1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate

2470


States some of the commonly used commands in cad software’s?

1224


how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour

1591


How to calculate construction cost of residential building in mumbai

2050


how to estimate material requirement for an area of house in square feet?

2352


What is the method of soil replacement test?

2149


what is right & short method of measurement of slab&beam

2080


What is the difference between Grade I, II and III of GSB?

2664


What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m

2195


Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.

2250