If we increase PI controller what will be action.
Answer Posted / kanishka verma
if we increase PI the overshoot will increase which cause to
the system increased its settling time to the set point.
| Is This Answer Correct ? | 12 Yes | 1 No |
Post New Answer View All Answers
What are the type of bonnets in the control valves?
How would you choose differential range?
what is metal of piston ring
When doing a liquid seal on a differential flow transmitter , most of the time the sealing liquid will be heavier then the process fluid. For wich application will the sealing liquid be lighter than the process fluid if transmitter is mounted below the process line.
why I need valve guard and whats different between guard and positioner ??
what is the procedure of O2 sensor(ABB) calibration?
What is Positive Calibration and Negative Calibration?
the pump holds on run indication into the dcs and filed local control panel remote push button condition operaton wrong like when the push button pushing conditions the pump is off and the push button release condition the pump is on totally opposite condition . And control room inside give the stop command into dcs just 1secon relay engage and again normal condition. How can I slove
what is cems analyzer explain with principle and drawing ?
What is frequency factor in massflow meter? When using frequency output?
Specific gravity.
How to calibrate displacer type level transmitter (chemtrol make )for level measurement in hotwell , LP & HP heater ?
how do we commission inergen system?
What is the use of control cable?
In my company plc based winders are operated. one day there was a data transmission failure alarm shown on pc. as per sir instruction we have reset master plc but winders were not triped and alarm gone. so what master plc do?