Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Boiler capacity is 5ton, what will be the feed water tank
capacity?

Answer Posted / d.sudhakar rao

If boiler capacity is five tons the feed water tank
capacity shouls be 4-5 times of the capacity of the boiler,
20 Kl to 25 KL is required.

Is This Answer Correct ?    4 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the meaning of SST300 V56A in SIEMENS turbine

4354


what is natural frequency of turbine shaft .

2281


What is LB-SR.

2996


im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much

1994


By any way can we increase the B check hours from 300 to 500

2189


What is surging in a centrifugal compressor ? How it occur's ? How is antisurging done ?

2435


Why superheated are started before I'd and rd fan?

2175


why do you consider yourself a suitable candidate for this position

7444


what does mean by kva rating

1504


How We Calibrate the vaccum transmitter?

1967


what is the trip circuit supervision in an electrical meaning?

2114


Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.

2413


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

2475


some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor

2411


what is the difference between compensated & normal drum level in boiler drum?

1797