Answer Posted / satish ramnath pekhale
Shuttering is formwork which is used to shape up footing, column, beam , slab as per there given shape and sizes. While centering is process of marking center over actual site as per drawing
| Is This Answer Correct ? | 6 Yes | 7 No |
Post New Answer View All Answers
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
Explain what is zoning permit?
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
What is the purpose of Chipping in the heavy foundation?
When was the first motorway built in england?
What is the strongest bridge for a school contest?
how much of the strength comes from post-production curing
how do you stabilize a waterlogged area in road construction
Are you ready to relocate with your immediate family to United States as a new employee?
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
What is bmc stands for in bmc software?
Different sizes of Hollow blocks and its weight. Thanks.
Define What are the uses of alloys in daily life and how are alloys made?
What are the steps involved in the concreting process?