Answer Posted / ganga
Hi,
The 2 answers are correct.But,in some machines the change
project option is not available in Tools menu.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How do you analyze your test results? What metrics do you try to provide?
Disavantages of document generator? How to take a print out of the steps in the Parameterized scripts?
Explain about user authentication in TD related to OS?
How many types of reports can be generated using testdirector?
Is there any possibility to restrict duplication of defects being created in td?
what are the type of testing and methodologies
can we connect qtp 8.2 version with test director 8.0 verion if how if not why 2)when test director 8.0 version released
Explain about failure options in TD
What is the difference between master test plan and test plan?
Of course, Test Director has recapped as Quality Center. What is the main difference between 8.2 version and 9.2 version of Quality Center?
What is the main purpose of storing requirements in test director?
what is the last version in TD to support for qtp?
What are the 3 views and what is the purpose of each view?
how can we see all fields in test director
Explain about "Defect life cycle" in HP Quality Center ?