Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

TRANSACTION CODE FOR GR/IR ACCOUNT CLEARING WITH POSTING
DATE OF GR (MATERIAL DOCUMENT POSTING DATE)TO CHECK ACTUAL
CLEARING GR/IR CONTROLLING ACCOUNT

Answer Posted / lakshmi niwas pathak

TRANSACTION CODE FOR GR/IR ACCOUNT CLEARING WITH POSTING
DATE OF GR (MATERIAL DOCUMENT POSTING DATE)TO CHECK ACTUAL

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Hello sir, I am Rajaram. I have finished DME (Diploma in Mechanical Engineering). I would like to attend BHEL supervisor examination. So i want which type of questions can i prepare. & give previous supervisor examinations questions. Reply my mail (rajaramsptc@gmail.com)

4222


how we can calculate natural vibration frequency for steam turbine rotor please.

3809


What is the use of center punch?

1239


I am a mechanical student.And have cleared the written for NTPC. Please suggest what and how to prepare for the interview.i have got only 2-3 weeks in hand.

1919


Action plan to closr NCR (NON COONFORMANCE REPORTS)

2270


What does angular momentum mean?

1141


How much calorific value of heat is needed to heat 00c of

1894


DIFFERENCE BETWEEN CODES,STANDARDS & SPECIFIFCATIONS?

2071


What is the purpose of increasing the pressure on the F.O. system of the engine?

2168


Which questions will be asked for mechanical design Engineer position in GE?? plz give me reply it's urgent...

2571


Critical speed of turbine means the natural frequency and resonance frequency are matching and cause for vibration and noise. which is the natural frequency. how it reflect in vibration.

1943


what are "R-condition"and "T-condition" in the designation of Steels ??

2838


What are the typical indicator diagrams?

2212


what is the responsibility of assistant manager in welding in goa shipyrad company?

3181


How can I weld A234 WPB and WPB P11 fitting? Any special heat treatment required? What happen if I weld both?

1457