how to cal 1:4 in brick masonary work cement and sand?
Answer Posted / sjtbehera
Approximate method to determine the qty of material of mortarfor 10cum brickwork- divide by 3 by the4 sum of numericalof the proportion of material which gives the qty. Of cement in cum. So 1:4=
3/1+4= .6 cum i.e 18 bags in 10 cum
Sand= .6 x 4 = 2.4 cum
It is ony applicable in 10 cum brickwork
You can try this method
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What are the important hardware systems used for cad?
What is the coeffiencent Friction Angle between Steel and Ashphalt?
Doul Bar reinforcement and details of drawing.
How to get MEP technical,instaaltion & testing data for interview?
how many type of admixtures for water stored structure?
What are some facts about concrete?
What is meant by dimensioning?
What does civil engineering mean?
Define absolute co-ordinates?
What Are The Different Type Of Slump Test Indications?
Formula of mid span bar
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
how much tempareture are required to make liquid state of pid leed
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
How many pyramid in egypt?