Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What should be percentage of silt content in sand?

Answer Posted / guddu singh

It's must that silt %
between 0-6% as per
IS If silt is more than
6% then we are
cleaning sand......

Is This Answer Correct ?    1 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why development length = 50D . why not 100D

2125


What is the purpose of the gap in the road on this bridge?

1384


WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?

2516


Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?

1921


What is horizon or horizontal mining?

1162


will fix foundation bolts at site with out template is there any procedure?

2687


how to calculate reinforcment in staircase cranked beam?

2912


strength vs shape factor

2601


How to determine spacing of bars in slabs or beams

2513


what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????

2115


How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)

2296


what is the exact dia of 8swg and 10swg gabion wire

2364


how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm

2095


how we check the thickness and line of ceiling plaster.

2725


i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI

2398