Answer Posted / guddu singh
It is permanent strain
due to load and
appears at support of
beams and other
structors. it's strain
also increas with
respect of time....
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
What is the significance of cost estimate knowledge for an architect?
What is componsation
how much repeitation for conventional and maivan formwork?
What is Rankine Cycle?
How long does it take concrete to harden?
What is the difference between undo & redo?
What are the ingredients of pre-stressed concrete?
how to design and calculate materail quantity for concrete speedbreaker ?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
sir please send me campus placement questions in civil engineering
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
indian standard split spoon sampler