what is the m25 test result 7 days 14 days

Answer Posted / imran

Ok fine let me start with 7 days strength, the provision of 7 Days Strength is now ended over Globally, else in previous version of IS was two third of the characteristics strength and 100% of characteristic strength after 14 days.
There Fore the Deflected Strength for M-25 in:
7 Days 16.67 N/mm2.
14 Days 25.00 N/mm2
28 Days 28.00 N/mm2 (As per Latest Revision of IS 456 Fck + 3)

Is This Answer Correct ?    2 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the exact dia of 8swg and 10swg gabion wire

1834


What are some facts about concrete?

655


What is specific gravity???

872


why top layer of block work shoud be full size if any cut block adjustable than another layer?

1669


Minimum concrete cover in slabs, columns, beams, foundation and other st?

665






What is change order request?

670


why development length = 50D . why not 100D

1471


What year was the keystone power plant in Indiana County constructed?

717


As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low

1061


how we can find sieve #4 is 4.75mm?

1870


What is bmc stands for in bmc software?

660


In Rcc ratio calculation I wanted to know quantity of Steel also.

1112


How to do rate analysis for concrete work including shuttering work?

1545


How much material will consume for following specification water tank (9*7.5*6 feet)?

1619


TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING

2092