Answer Posted / imran
Ok fine let me start with 7 days strength, the provision of 7 Days Strength is now ended over Globally, else in previous version of IS was two third of the characteristics strength and 100% of characteristic strength after 14 days.
There Fore the Deflected Strength for M-25 in:
7 Days 16.67 N/mm2.
14 Days 25.00 N/mm2
28 Days 28.00 N/mm2 (As per Latest Revision of IS 456 Fck + 3)
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
if dia of slab beam bar is38mm what its clear cover any method of provide clear cover
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
What is meant by a context menu in a cad software?
how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend
What is the diff between cad & cadd?
how u design STAGING for Superstructure in BRIDGE construction?
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
on what basis the partial factor of safety are decided? form the load combinations
What is Critical path in Ms-Project ?
What is thumb rule in quantity and cost estimation of a residential building?