why the compressive strength of concrete is calculated only after 28 days.why not after 25, 26,27 days..
Answer Posted / imran
Answer # 4 is the correct answer of this question.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
procedure for preliminary selection of size of column of 5 storey building
what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?
How many days should curing of plastering, brick work and concrete
what discoveries did you have in relation to your course?
WHAT IS YOUR CURRENT SALARY
what is the theoritical percentage of concrete cubes testing per day?
significance of specific surface area of particles?
Can we use concrete of slump cone in cube casting in which we have already measured slump?
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
Difference between pre-tensioning and post-tensioning.
what is flashing?
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
What are wooden shingles?