Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

A 3-phase IM is supplied from 50 Hz system. It runs at speed
of 1440 rpm and slip equal to 4 %. Calculate rotor
frequency.
A 50 Hz B 0 Hz
C 4 Hz D 6 Hz

Answer Posted / ankit

A. 50Hz

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

In a tap changing transformer where is the tap connected, is it connected in the primary side or secondary side?

1140


1hp= how much rpm

2077


what is meant by impedance & transient protection?

2107


for a 500 KVA connected load, I calculated 30% of capactor for power correction. Even after using 225 KVR capactor PF is not improving. What could be reason for low Phase correction factor?

1964


it is possible to rotate the DG engine dc starter with wrong polarity connections? why?

2255


What are the commonly used schemes for the bus zone protection?

1064


Starting times for soft starter & power factor is thier any standard or datas available in manufactures list. Kindly suggest.

1933


How to decide cable tray size?

1140


What is 11 N1 and 12 N2 in single phase Transformer ?

1934


what are the effects when a salient pole alternator is run at high speed like 3000 r.p.m?

2427


USE OF 8 WAY PAN ASSEMBLY

1963


WHY THE RATINGS OF THE TRANSFORMER IS 33KV WHY NOT OTHER???

2390


In what cases (circumstances)we should apply P controller, PD controller, PI controller & PID controller ?

2183


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1795


Meaning of ingrace protection for motor.for ex IPXY

2915