what is the meaning for 'prime cost' in civil construction
contracts?
Answer Posted / prashant
it is a single fixed price contract in which contractor
agrees to perform specified job for fixed sum.
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
what is yield and tensile strength of steel, if steel has yeilding strength of 60 psi than how much its tensile strength?
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
which type of instrument included in plumbing work?name of instrument?
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
Explain the mechanism of cavitations in pipes and drains?
Detection of a beam & a girder areββββ
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
How many % we consider for lap for reinforcement for estimates
how to calculate the chair reinforcement length in slabs, footing or anywhere??
What are the different approaches in designing the floors of the service reservoirs?
how much quantity of cement,sand and water required for 1 sq feet flooring work .