Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what ratio of cement and sand we used for making cover

Answer Posted / pkpriyadarshi

1:3

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How much cum. Brick work can do by 1 madon

1695


how much is the maximum compressive strength of soil cement and soil-cement-microsilica .

2329


explain the advantages of total stasion

2248


resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil

2736


What is the density of DLC & PQC and how it is differ from normal concrete?

3808


How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft

2238


when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?

2662


Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.

2593


Time required for curing of wall tiles before fixing

2261


How will be cutting in timber plate size 600*400 column size

1874


why we use aggregate,sand with cement in concrete?

10051


how we can find sieve #4 is 4.75mm?

2365


within an emergency scenario what are the safe systems of work a coss can setup as part of is duties

2196


what is work of planning deptt. in any construction compny (in road project)

2524


Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.

2915