How to calculate sand,cement for 1:5ratio brick masonary
Answer Posted / shashi roy
.26cum sand required 4.
1cum brick work
then.26/5=.052
.052×1440=74.88
74.88/50=1.497bags
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is difference between code and standard and specification?
plumbing CPVC fitting FTE Brass full form
Differentiate first angle & third angle projection?
what are the types of dimensioning?
how u design STAGING for Superstructure in BRIDGE construction?
How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently
Basic civil interview questions
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
how much cost of single coat 20mm thick plastering per sqre meter
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
States some of the tool bars used in cad?
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
What do you mean by honeycomb in concrete?
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water