How will we calculate the number of cement bags in 6 foot by 6
foot footing?
Answer Posted / shashi roy
it's depend on which grade concrete we use and what is design mix
when we use m30 then 21 bags of cement we use
if depth of footing is also 6 ft
328kg cement consum in 1cum concrete.
Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
What are advancements in civil engineering?
Which prize is the alternative to the NOVEL Prize?
can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?
Curvature ki quantity kaise nikalte hai pls give me ans... curvature canal ka hai
What is the primary difference between adsorption and absorption?
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'
how to take concrete quantity for precast segment for viaduct project?
how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
How much of the strength of concrete comes from post- production curing?
Formula for calculation volume of essentric footing
door and window wood work calculations and different methods
how to calculate MR 9(derivation)
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
Volume of 25kg putty bag & 40 kg putty bag volume??