Answer Posted / ratheesh
if you are kept unshapely, you can't take the proper
measurement.
if you are kept Trapezoidal shapely, we can take the correct
quantity. (you may see in Railway stations)
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
how to calculate the length diamond shaped striupps in column
Why does the pressure increase under soil?
what are the challenges of being a team leader and a supervisor?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement
How much quantity of cement,sand,stone used to build 1 cum of cc road??
What is portland cement
What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.
How much cement will require for 1Rmt Skirting laying
how much percent are used 20mm,10mm?
What are the advantages of cad software’s?
Why nautical mile is different from statute mile?
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
door and window wood work calculations and different methods
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?