Answer Posted / ratheesh
if you are kept unshapely, you can't take the proper
measurement.
if you are kept Trapezoidal shapely, we can take the correct
quantity. (you may see in Railway stations)
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
what is the difference between replacement of cement by groundnut shell ash
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
Which type of plywood & sizes using in construction projects ?
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
What is the diff between cad & cadd?
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water
Describe the advantages and disadvantages of using plastic and timber fenders?
what is diffrence between catchment area,watershed and basin?
Define What is diversion tunnel in a dam?
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
Why Should Curing Not Be Done By Ponding And Polythene Sheets?
What is passive earth pressure ?
In cement making,what is meaning of blend,fineness,density.
what is the types of surveying?which type of survey carrying for type of work?
Is there any course for billing available in Mumbai? If yes then please mail me the details..