Answer Posted / ratheesh
if you are kept unshapely, you can't take the proper
measurement.
if you are kept Trapezoidal shapely, we can take the correct
quantity. (you may see in Railway stations)
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
What is the difference between a wood shake and wood shingles?
how much need sand and cement for 1 cft roof construction?
What does civil status mean?
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
How to design staircase.plz tell me formula for the design the staircase.
what r you reqired for concrete baching plant?
what is the productivity in aluminium shuttering per day
Why was the empire state building made of steel?
what is the coefficient for running feet to cft coversion both area and price
What things you need to take care of before building a kitchen island?
what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????
What black man invented the clothes dryer?
How does a traffic light signal work ?
what is mean by c32/40s concrete class