How you Confirm the Hard stratum for Driven cat in situ Pile
work?
Answer Posted / sampath kumar
Depth of cutting should be less than 5 times dia of pile at
max force then we can confirm that stratum is Hard
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
What glue is least sticky?
what do you know that m20,m25
what is pqc
how i can tak Quantity of mortar in block work
What are the reasons for geotechnical site investigations in uganda?
For Wet Mix Mecadam design what is Optimum moisture content
Critical Path Method is...
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
can you provide a link for manual design of building?
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
What is the origin of name railway sleepers?
what's the formula for calculate pcc for matt(45mm aggregate)?
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?