How you Confirm the Hard stratum for Driven cat in situ Pile
work?
Answer Posted / sampath kumar
Depth of cutting should be less than 5 times dia of pile at
max force then we can confirm that stratum is Hard
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Explain what is progress payment?
what is the water cement ratio for plastering
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
what does the track parameter mean in staad.pro?
Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.
What is the minimum size of the particles of silt soil?
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
How many % we consider for lap for reinforcement for estimates
What is thumb rule in quality and quantity estimation of a Residential building??
what is the dimensions of river sand truck trailer or trolly ?
what is hydrostatic paradox?
Howmuch bend to be provide for 200/600 BEEM
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
PL.tell me about civil engineering questions with answer