Answer Posted / kj
Most generator manufacturers have a requirement of the sets
being regularly serviced. The are also different codes
(e.g. fire codes) which require the regular servicing. The
type of service is usually designated as A to D.
An A service is usually a check of the generator to make
sure all systems are functioning correctly.
This steps up through oil and filter change to replacement
of consumable parts at D.
Consumable parts are the parts such and belts, hoses,
coolant pump, injectors, etc.
Each of these services are set by a time period or hours of
operation similar to the servicing of a car.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
defination of controlled shunt reactor
hi frnds can any one help me ? plz send me placement paper of IOCL of Electrical streem .... plz send ....its urgent....
What is d main advantage of using double circuit 3 phase transmission ?
What are the effects of electrical faults?
I need the recommended size for a 3 phase transformer at 13.8 KV Primary and connected loads of 3000 kVA at 4200 volts and 2375 kVA @ 480 volts AC.
how to select energy meter? have any calculation?
is there any phase difference occurs while primary and secondary side mutual induction occurs?
Hi, Next week Iam appearing RRB exam for section engineer. So help me to get modal question papers for this position. Iam very thankful to you. Whether question will be fully techanical format or general form. Please give me a details regarding this exam.
When we have earthing mesh or underground earthing network in industrial plants, weather we have NT-S or NT-C-S kind of earthing system, so eventually weather we must use 4 or 5 wire in 400 volt level (For example 3×150+70 mm2 or 5×150 mm2) in this connection I would like to know exactly the paragraph of IEC or IEEE number
what are the principles of a booster converter?
what type of motor used to move a 1 ton gate? and relate ratings with load.
how to calculate maximum current
WHAT SHOULD BE THE BEST CURRENT RATINGS (PRIMARY / SECONDARY)FOR A CT INSTALLED AT THE INCOMING 11KV PANE? WILL IT BE CALCULATED ON THE BASES OF MAXIMUM DEMANT VALUE OR ON SUM OF ALL TRANSFORMER'S KVA? NOMALLY MAX DEMAND REPRESENT THE MAXIMUM OPERATING LOAD OF THE PLANT AND TOTAL KVA OF (SAY 5 NUMBERS TRANSFORMERS) REPRESENT THE CONNECTED LOAD. WHICH i.e. MAX DEMAND KVA OR CONNECTED KVA ARE BETTER TO USE FOR CT CURRENT CALCULATION? PLEASE ANSWER.
The capacitive reactance of a capacitor of 1/(2(PI)) F at 10^3 H is
What is the difference between single point and double point bonding. please kindly detail about bonding of cables.