IN LOW RISE BUILDING PER SQ FT HOW MANY MATERIAL REQ. SAND
&CONCREATE&CEMEBT
Answer Posted / manish kumar
signal work depend upon road traffic condition
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
In reclamation works what are the importance of geotextiles and sand?
what post do you prefer to work in this company and why do you think you can serve better in such position?
what isload waring calculation
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
The largest size of paper used in plotter to print the drawing made by Autocad .
How many square meter can a worker/labor demolish a structure per day?
what are the ffactors you considered choosing the course?
how to calculate freeboard in under ground water tank and technical details
What happens to Load at yielding ?
why & what is perchatage we are using fly ash in concrete?
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
Why should you show Client/Engineer activities clearly on the project plan?
what is high type road and low type roads
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel