IN LOW RISE BUILDING PER SQ FT HOW MANY MATERIAL REQ. SAND
&CONCREATE&CEMEBT
Answer Posted / manish kumar
signal work depend upon road traffic condition
Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
according to the painting co efficient, we should take the one side of doors (or) windows or both sides?
which type of instrument included in plumbing work?name of instrument?
What is the absolute pressure scale?
How do you compute volume of airflow?
Explain what is the difference between built area and super built up area?
What is the meaning of a blue land surveyors flag?
What is construction mitigation management?
acceptance criteria for concrete works
How to calculate Volume of Wet cement concrete for a specific grade?
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
How to calculate canal slope curvature qty!
it is a corrected question." make a list of engineering property(properties) of soil.
What is the difference between one-way slab and two-way slab?
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.