IN LOW RISE BUILDING PER SQ FT HOW MANY MATERIAL REQ. SAND
&CONCREATE&CEMEBT

Answer Posted / manish kumar

signal work depend upon road traffic condition

Is This Answer Correct ?    0 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

according to the painting co efficient, we should take the one side of doors (or) windows or both sides?

1310


which type of instrument included in plumbing work?name of instrument?

1713


What is the absolute pressure scale?

677


How do you compute volume of airflow?

687


Explain what is the difference between built area and super built up area?

691






What is the meaning of a blue land surveyors flag?

779


What is construction mitigation management?

1835


acceptance criteria for concrete works

1683


How to calculate Volume of Wet cement concrete for a specific grade?

1772


5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)

1656


How to calculate canal slope curvature qty!

1328


it is a corrected question." make a list of engineering property(properties) of soil.

1596


What is the difference between one-way slab and two-way slab?

666


Can a wave happen in the middle of the ocean like in the movie poseidon 2006?

691


Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.

10823