1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3
Answer Posted / gowrishankar
Plastering per day 8 hours one mason and helper will cover 10 m2
| Is This Answer Correct ? | 321 Yes | 61 No |
Post New Answer View All Answers
Define What is passive earth pressure ?
What is demising walls?
Slab quantity
Whats the meanig of ,'K' VALUE in the case of soil.....
What are the RISKS during the project construction?
how calucate cement sand ratio for plstering
Prepare a Schedule for a Highrised building from starting stage to Handover?
what could be the production cost of 1 cum of concrete by CP30 plant
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
how to convert sand in Cft to Kgs
Define What are the materials used in building a gravity dam?
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
What is bmc stands for in bmc software?
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?