1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3
Answer Posted / gowrishankar
Plastering per day 8 hours one mason and helper will cover 10 m2
Is This Answer Correct ? | 315 Yes | 61 No |
Post New Answer View All Answers
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
How do we test on design and style in a software?
how to calculate steel for slab or footings?
column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial
what is the difference b/w full length and cutting length?
will fix foundation bolts at site with out template is there any procedure?
What is the difference between routing maintenance and major maintenance in school facilities?
How do we calculate absolute pressure?
What are the problems one might face while having a Cantilever balcony?
whats is difference between anchorage length and development length
what is stressing
Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?
Questions related to civil.engg in company
specifications of fe500 steel
Define line type?