1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3

Answer Posted / gowrishankar

Plastering per day 8 hours one mason and helper will cover 10 m2

Is This Answer Correct ?    315 Yes 61 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?

11537


How do we test on design and style in a software?

681


how to calculate steel for slab or footings?

1192


column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial

3489


what is the difference b/w full length and cutting length?

1810






will fix foundation bolts at site with out template is there any procedure?

2163


What is the difference between routing maintenance and major maintenance in school facilities?

667


How do we calculate absolute pressure?

774


What are the problems one might face while having a Cantilever balcony?

1047


whats is difference between anchorage length and development length

1376


what is stressing

5812


Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?

1891


Questions related to civil.engg in company

1578


specifications of fe500 steel

3047


Define line type?

679