1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3
Answer Posted / gowrishankar
Plastering per day 8 hours one mason and helper will cover 10 m2
| Is This Answer Correct ? | 321 Yes | 61 No |
Post New Answer View All Answers
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
how many running meters in one kilogram of 4mm pvc coated chainlink fencing
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
What is unit weight of roadway layer.. 1.bitumen 2.sand 3.soil 4.concrete 5. aggregate give me some reference for this answers
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
Why Should Curing Not Be Done By Ponding And Polythene Sheets?
what could be the production cost of 1 cum of concrete by CP30 plant
How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently
What is rate for brick masonry work of 1.0 m3 in cm 1:6?
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy
What difference comes in constructing of house and a housing complex like society
Define mirror?
what is column foundation
why building got air crack? if it get in one particular are what is means?