Answer Posted / pranav panchal
Due to rusting the corrosion occurs in the steel and due to corrosion steel lefts its self yield strength & bonding with the concrete also.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
how calucate cement sand ratio for plstering
Define What is the meaning of a blue land surveyors flag?
How to estabilish reinforcement Steel rolling margin for a building projects ?
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
sir how can we find the cement and sand required for making 4" drop
What is the difference between Grade I, II and III of GSB?
what is the water-cement ratio of mix design while 30mpa in 7 days?
What is the yield of 100 litres of water and 10 kg of cement in grout mix?
how to prepare site mix design
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
How to plan a project
WHAT IS YOUR CURRENT SALARY