Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is Droop Control in Woodward?

Answer Posted / sharanjit

WHEN TWO TURBINES ARE RUNNING IN APLANT IN ISALND MODE THAN ONE IS IN DROOP MODE ANDONE IS MASTER MODE.

AS THEIR ARE GOVERNERS FOR EACH TURBINE. SO WE MAKE ONE GOVERNNER FUNCTIONING AS MASTER EHICH OPERATES AND MAINTAIN ONE TURBINE FUNCTIONING AT A DEFINE DPARAMETER ,BUT THE SECOUND DRROP MODE TURBINE WILL FOLLOW THE MASTER AND WILL FOLLOW LOAD

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

LAPT working in alternator / generator

3614


what is the trip circuit supervision in an electrical meaning?

2107


what is the basic use of power plant in equipment

1734


What is difference between secondary Air & Tertiary Air and Their use.?

1990


what's the moog valve

1489


im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much

1985


dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job

2531


some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor

2396


why do you consider yourself a suitable candidate for this position

7432


By any way can we increase the B check hours from 300 to 500

2180


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

2469


can dp type level transmitter work in under vaccum condition

1973


what is natural frequency of turbine shaft .

2271


what is the meaning of SST300 V56A in SIEMENS turbine

4344


operation

1878