what is the labour requirement for solid & hollow block work
Answer Posted / ramen_pintu
For 1cum Solid Block Work 1masson & 3helper in 8Hrs
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?
How many square meter can a worker/labor demolish a structure per day?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
Define What is diversion tunnel in a dam?
it is a corrected question." make a list of engineering property(properties) of soil.
How many feet are in 4 square yards?
What is the software used in civil engineering?
where i can get material costs on weekly basis
What is zoning permit?
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
how to nfind out the specific gravity of sand.aggregate,water please help...
What is the tallest man made structure in the world?
What is the Unit weight of coarse sand (F.M- 2.20) ?????
what is BPM in concrete demolition hammers. what is better a higher value or lower