what is the tool used at construction site for measuring
cement, sand and blue metal in india.
Answer Posted / ratheesh
Measuring box, This size is 1'X 1'X 1'3".
Because one bag cement is 1.25 cft...
also u can measure sand & aggregate.
Is This Answer Correct ? | 14 Yes | 3 No |
Post New Answer View All Answers
can you give me the details of rate analysis of steel and concrete?
What is the Maximum %age of Steel in columns and beams ?
what is the Asfalt test?in road constraction..?
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
How to calculate material and labor required for 100 m2 plaster?
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
I need old MMUP exam question and answer for Civil engineering
how to identify the failure of building by expansive soils
How many axes do cartesian coordinate system has?
what is project?
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
it is possiblee to produce concrete with out cracks...
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
whats is difference between anchorage length and development length