How many different between estimated quantity and practical
work at site.
Answer Posted / ratheesh
overall 5%
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10
1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
How is improve my knowledge in construction industries....
what is differences between ferrock and concrete ?
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
why we use aggregate,sand with cement in concrete?
can any one explain bar bending schedule of bems and columns and slabs ??
How do you prepare Material Recovery Statement for deduction from contractors bills?
Which architectural movement is also known as jazz moderna?
how to calculate weight of 1.8 cum of aggregate
define the strength