How many different between estimated quantity and practical
work at site.

Answer Posted / ratheesh

overall 5%

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Formula for calculating the volume of bulb in underreamed pile

4392


One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?

1847


how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')

2176


What is the meaning of a blue land surveyors flag?

775


what post do you prefer to work in this company and why do you think you can serve better in such position?

2232






what is the use of beam end forces while using a staad ? wha they are show

2474


what is the maximum number of course that can be laid according to IS code and the max height.

1479


Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?

1720


How to do bbs in excel format

1589


I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks. 

2320


Define graphics window?

704


how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?

1529


Mention different types of roof systems?

721


What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code

1607


How to compute minimum number of columns required for a site from area of site?

1528