Answer Posted / mitch
The minimum clear spacing between parallel bars in a layer shall be db(diameter of bar) but not less than 25mm. [see sec. 407.7 NSCP 2010 for Spacing limits for reinforcement.]
| Is This Answer Correct ? | 11 Yes | 5 No |
Post New Answer View All Answers
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
how many shuttering material required for 1000 sq.m built up area.
how to calculate total cost for slab 35'×8'
Explain what are the problems one might face while having a Cantilever balcony?
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
how gradation of aggregates effect on slump of fresh concrete?
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
In earth work 1300 cum soil how to calculate how many liters require in water
could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!
what is the dimensions of river sand truck trailer or trolly ?
What is the difference between EPC,DBOOT and BOOT.
Define aligned dimension?
What is bylayer?
What is the maximum strength of cub compress strength in one cub testing