Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the significance of per unit impedance ?

Answer Posted / praveen

In power system values of impedence will be large so to
reduce its complexcity in calculation it is expressed in
per unit....

Is This Answer Correct ?    9 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

HOW TO SET THE EARTH FAULT SETTINGS IN ACB????????????

2118


what kvrah y we need to take the readind of that

2034


what is meant by vector group of a transformer? How can it be derived?

1936


what is consequences of neutral and earth connect?

2054


why transmission is only 3 phase and not 2 or 4 or poly phases

2066


What is the armature mmf in a D.C machine?

1180


why ss stablity limit is more transient stablity limit?

2144


What is the slip speed?

1040


how much leakage current is allowed in MC61A L&T make relay?

3608


how can we design robots

1897


previous year paper of ntpc bhel for degree in electrical enng

3158


what are the steps involved in generator load test?

1511


234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,

2176


We have received supplies of the ordered material. payments against the supplies also released. Where ST paid 4% against form C. Meanwhile it has been observed that 25% of material supplied was defective. Please suggest whether the issuance of C form from our side would be stopped till settlement of liabilities.

1900


What is the formula for calculating the Instantaneous Short Circuit & overcurrent for any breaker

1943