how we can calaculate cutting lengh for stiruups 6mm dia .
column size 20 cm x 30 cm, cover 20mm

Answer Posted / santo.m.f

103.20 cm

Is This Answer Correct ?    7 Yes 11 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

water leak detection system question & answer

2524


Technical Question of Civil Engineering

2355


Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?

2085


please send me bhel questions on rupesh.017@rediffmail.com

2794


Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.

2310


How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?

1615


Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com

2096


What is the per cu. mt. price of ready mix in Gujarat region.?

2427


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2232


I need to constructive work in amaraj batteries

1937


i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............

3220


what is the difference between replacement of cement by groundnut shell ash

3303


Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting

1894


I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.

2504


can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now