Answer Posted / skj
30-50mm bt we are genrally use 40mm
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
Explain what is progress payment?
what is meant by residual strain?
Who designed the city of washington dc?
why +1 to be followed for calculating the no of bars in BBS. Please explain
specifications of fe500 steel
What is Base Shear ?
What is the difference between chamfer and fillet?
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
For fine aggregate which is most suitable River sand or crusher sand & why ?
explain five benefits of using standard terminology in the measurement process?
how to calculate the length diamond shaped striupps in column
how to calculate spacing rod in column
How much percentage of brick bats allowed in CD-75 bricks
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?