What is the Laplenth for Reinforcement for Verticl and
horizontal Structures as per IS code?
Answer Posted / kj
Vertical is a commpression member like coloumns etc and horizontal is a bending member.Depending on grade lap length will be determined.Horizontal will be more allways as bending stress.
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
How much does the leaning tower of pisa lean?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial
How do you maintain water pressure?
What are the common ways of demolition?
what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?
Define What are the uses of Groynes?
1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
How to testing voids of filled aggregate in bitumen mix design
Explain what are the skills required to become an architect?
why we can use dust in concrete insted of fly ash
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
How high should the water tank be to provide a 60 psi at base of this water tower?